  • London Bridge (Jonathan Wright, Balfour Beatty)

    Jonathan will detail some of the construction challenges and successes of providing the new track infrastructure for the London Bridge station remodelling and “untangling the tracks” as part of the Thameslink Programme.
    The track element of this major multi-disciplinary project saw 161 units of S&C and 38 km of plain line installed, with delivery over 128 track stages and 9 major resignalling stages. The greatest success was the interfacing with the other railway and civil engineering disciplines to ensure all programme dates were met and trains were kept running through the 4th busiest station in Britain.