Remember me | Forgotten password?
  • This Event was held 6 months ago
  • Milton Keynes Section Meeting - Thameslink Programme: Track Engineering at London Bridge, Overview & Lessons Learned
  • Kevin Thurlow
  •  Milton Keynes Section Meeting 

     

    Thameslink Programme: Track Engineering at London Bridge, Overview & Lessons Learned (Robert Holbrow, Senior Project Engineer, Infrastructure Projects, Network Rail)

    As the track construction on the Thameslink Programme draws to a close,this presentation will give an overview of the scope of track work associated with re-building London Bridge as well some of the engineering challenges and how they were overcome. Topics covered include; managing interfaces with major civil works, the use of Geospatial mapping to aid planning and delivery, railway systems design integration in 3D, as well as the technical challenges and innovations involved in building in a highly constrained, intensely used area.

     

    Meeting from 16:30 for light refreshments for a 17:00 start

  • 12/04/2018 17:00
  • 12/04/2018 19:00
  • Rooms G09 & 10, The Quadrant, Network Rail, Elder Gate, Milton Keynes MK9 1EN
  • 2.0