Remember me | Forgotten password?

'Thames Valley Section'

Thames Valley Section Meeting -Cardiff Intersection Bridge: Part 2

Date: 04/03/2020 17:45

Cardiff Intersection Bridge: Part 2 (Phil Holbourn, Holbourn Engineering Ltd & Network Rail)

Philip will describe the challenging alternative solution that has been implemented at Cardiff Intersection Bridges, where the distances between wire/bridge and also wire/train have been reduced to very low levels. The solution involves unusual track forms, use of surge arrestors, a specialist insulated coating on the bridge, water troughs, bridge strengthening works, lots of documentation, ...

Thames Valley Section Meeting - In-Possession Approvals of Rail Plant

Date: 01/04/2020 17:45

In-Possession Approvals of Rail Plant (Sam Barrett, Senior Engineer, Aegis Certification Services)

Meeting from 17:00 for light refreshments for a 17:45 start.

Thames Valley Section Meeting - Kings Cross remodelling

Date: 06/05/2020 17:45

Kings Cross remodelling (John Hilliard, Assoc. Director, Engineering Integration Ltd.)

Meeting from 17:00 for a 17:45 start.

Thames Valley Section Meeting - The Role of Transport for Wales

Date: 03/06/2020 17:45

The Role of Transport for Wales (Alan Whiston, Senior Asset Engineer for Track, Off-Track and Earthworks, TfW)

Meeting from 17:00 for a 17:45 start.